Aaron Cake
Administrator
Canada
6718 Posts |
Posted - Jan 27 2009 : 11:39:19 AM
|
Well, it's sort of planned. London Hydro needs to shut down the power between 5 and 7 AM of Jan. 28th to perform some maintenance and repairs. I'll have about an hours worth of UPS and then I'll be shutting down the servers until the power is back on. It would be unfair to run the unmuffled generator at those hours of the morning. |
|